High Tensile Bailey Suspension Bridge Span Length 60-300m Convenient Installation

Basic Information
Place of Origin: Zhenjiang City , China
Brand Name: Great Wall
Certification: BV,SGS,CCIC,CNAS,CE
Model Number: CB100 and CB200
Minimum Order Quantity: According to the order
Price: According to the order
Delivery Time: According to the order
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 50,000 Tons per year

Convenient installation Steel Cable Suspension Bridge Elegant appearance

Description

We have professional design, high cost performance products and installation instructors for obsessive-compulsive disorder.There  also been numerous cases.

 

 

Suspension Bridges are used for the longest spans across river estuaries where intermediate piers are not feasible, the cables form catenaries supporting both sides of the deck and are tied to the ground usually by gravity foundations sometimes combined with rock anchors. They are less suitable for heavy loading such as railway traffic, especially for short spans.

 

Suspension Bridge is a kind of suspended-cable-system bridge,in which the steel decks are used as members,can be exerted the steel characteristic of high tensile totally in a big span,mainly used to span the wide river,bay and canyon,possessing te advantages of quick erection,short construction time and the bridge components can be used repeatedly;The span length is adapted to 60-300m.

 

 

High Tensile Bailey Suspension Bridge  Span Length 60-300m Convenient Installation

Specifications
  Single lane Double lane
Width: Standard roadway: 3.15m / 4m/4.2m Standard roadway:7.35M
Maximum Free Span: 300M 200M
Deck Anti-skid Steel/Timber/Concrete/Epoxy Mixture Material
Loading Capacity design according to different requirements,like people walking, 40TONNES,AASHTO HS20,HS25-44,BS5400HA+30HB,Truck-60,Trailler 80,etc.
Corrosion Prevention Original Painted Or Hot Dip Galvanized
Bridge Type Cables Suspended ; Compact-100 & 200-type
Advantages Big Span, bridge components used repeatedly,etc
Disadvantages More complicated in erection;Installation tools need to be special-made;High-cost of Cables

 

 

 

 

Bailey Bridge From China ;Great Wall Profile.pdf

Contact Details
Chen

WhatsApp : 008618652846913